Case Study: Loughatalia Bridge Marine Project
Loughatalia bridge is Clareco’s largest marine project to date. The bridge had to be re-enforced for the resumption of the train line in Galway city and Clareco were awarded the scaffolding contract for the industrial painting of the bridge.
The scaffolding was designed by Lynch Scaffold Design from Cork and included in the design were river platforms for scaffolding called pontoons.
This project was a challenging yet rewarding one for Clareco which improved our reputation in the marine sector.
Related posts
Podium Steps Now Available from ClareCo
ClareCo are pleased to now supply UTS Podium Steps and Decks, low-level access solutions.
Happy Christmas from all at ClareCo
2024 has been remarkable for ClareCo, and it’s all thanks to our amazing people.
Space Solutions: ClareCo Storage Container Rental
Looking for a reliable and convenient storage solution? Look no further than ClareCo Storage..
Buying a Storage Container in Ireland: 40ft..
Are you in need of extra storage space in Ireland? Look no further than a 40ft shipping..
Organize and Optimize: Storage Containers in..
In Ireland, storage containers have become an indispensable solution for individuals and..
Shipping Container Toilet Blocks: The Ultimate..
Shipping Container Toilet Blocks are revolutionizing portable sanitation solutions across..